Project description:

Feasibility studies alternatively solved the new design of the runway system (runway and TWY) and the APN of the 21st zTL airport. They dealt with their equipment, including operationally related facilities and the necessary infrastructure. Following the new runway system, it also solves lighting, radio navigation and weather equipment. Variants dealt with the length of the runway, the position of the parallel TWY and the possibility of its use as an emergency runway, the location of parking areas for ammunition, stations of the supervisory engineer air services, etc.

Investor: Ministry of Defence of the Czech Republic

Project processing date: 2019

Type of project documentation:

  • Studies