Project description:
Project of a new terminal for passenger handling and a new transport solution in front of the new terminal at M. R. Štefánik Airport in Bratislava (BTS) in Slovakia. The construction of the new terminal took place during full operation of the airport and was implemented in two stages. The dimensions of the main terminal building are 170×70 m and a height of 21 m. The terminal has a total of 5 floors (4 ground and 1 underground). The proposed capacity is approximately 4.2 million of passengers handled per year and the hourly peak is 1,500 passengers handled, of which a maximum of 1,000 in one direction (on departure or arrival).
Investor: Letisko M. R. Štefánika – Airport Bratislava, a. s.
Project processing date: 2008-2010
Type of project documentation: